The completion of the cellar stairs was a major feat. As they said ,"third time is the charm". Thats our motto. The utilities were installed this week. Electric though temp on pole, its power. The rough in on plumbing is done, and thats another story, is being inspected tomorrow . All doors are now in, we are ready for the floods. The front wall which we left open for light is enclosed.
As the days are drawing closer to the 22nd, I am shifting my attention to wedding details. Pete and Rye will attempt the deck and siding. Thats the wrap for this week. OH!!! forgot to mention it rained all day here today. Awww cooler temps and end of some of the dust!!!!
.
Sunday, September 9, 2007
Saturday, September 1, 2007
This week's accomplishments.......septic system,windows, and completed roof!!!
Final the roof is complete, the area still exposed is to be sided. The septic tank is installed and passed inspection, and all the windows are installed. The temperatures are more friendly with a pleasant breeze. Thank you god!!!! I was hoping to include the finished stairs, BUT.......thats another story..stay tuned for more updates. It's Labor day weekend, can't believe it, 3 weeks to wedding.....gotta go......ya'll come back now.
Subscribe to:
Posts (Atom)