Tuesday, July 31, 2007

floor is poured






Today at 7am the floor pour comenced as promised! The boys at bluegrass did a fine job Thank You Guys!!!!The floor is now slick finished and sealed. The outside walls have been coated with waterproofing and we are ready to start framing the front wall and the 2 load bearers in the basement whew!!!!! Our only hiccup in all of this was 2 inches of rain that fell friday night into sat morning but it did nothing to the schedule


P&J

Monday, July 30, 2007

Monday"s progress






Friday we had the walls poured all weekend we worked getting drainage and basement plumbing done. Today Bluegrass and associates(our concrete contractor) came back and stripped the forms off the inside of the foundation and prepared the floor for pour tomorrow at 7 am

Thursday, July 26, 2007

more photos from new south lapham land




these are the pics of the walls before pouring

Construction pix from New South Lapham Land

The hole is dug





These Pix are in reverse order. Please excuse us (blogging is new to us). So the last pic shows the site before we broke ground, the second to last shows The forms being installed. The 3rd from the lasy shows footers being poured. The first and second photo is the holeand the 3rd is the first concrete truck coming to pour the footer